|
> the product research and development ability:
- new product development cycle time: 3~4 weeks
- monthly open capacity: 10 sets, 2~3 products
1.Technology department organization chart

2.New product development process

3.The development of software
>3D model design software: WILDFIRE 4
>2D design software: AutoCAD 2004
>Mouldflow Plastic Insight 6.1 (mold flow analysis software)




4.Mold manufacturing
 |
(C) 2015 jiven.cn. All rights reserved. 吉文电子有限公司版权所有 |
|